Engineering




ProMach SEPARATOR

    Consistently High Efficiency

    Low Operating Cost

    Low Maintenance Cost

    High Cooling Capability



I. Grinding solution                                          II. Pyro solution

Turnkey for new grinding plant                                             Turnkey for cement plant uprate capacity

Modification of existing grinding plant                                  Kiln & Cooler Optimization

   - Mill Optimization                                                                Maximize alternative fuel (AF) substitution

     To check performance of the existing system and find      Preheater Cyclone Pressure loss reduction

     out rooms for improvement e.g. Diaphragm relocation      Production Rate increase 7-10%

   - High Efficiency Separator                                                  Power consumption reduction 14%

   Production Rate increase 10-30%

   Power Consumption reduction 1.5-5.0 kWh/t


III. CFD-based engineering solutions

To find out the root cause of problem and to offer best

solutions to solve customer’s chronic problems

    - Increase lifetime of filter bag

    - Robust machine design


Plant performance improvement

Expertize in engineering solutions by proven in-house

product development with 100-year experiences in

cement plant operation and explore to adjacent business.

Purposes:

Focus on improving energy efficiency both power

consumption and heat consumption, increasing

production rate and environmental concern.